Home | How You Can Help | News and Events | A Safer Airport | General Aviation Info | Contact Us | Related Links

PARTNERS @ Solberg - Pilots And Residents Together Negotiating Effective and Reasonable Solutions
How You Can Help
 Join PARTNERS @ Solberg

 Sign Our Petition

 Make a Contribution

 Express Your Support

 Web Discussion Forum

More Ways to Help ...


News and Events
 Recent News

 Dear Readington Residents

 Airport Design Contest

 Calendar of Events

More News ...


A Safer Airport
 It's Your Airport

 Did You Know???

 Airport Improvement Summary

 Master Plan

 Bill A2332
(Airport Preservation)

More Info ...


General Aviation Info
 What is General Aviation?

 Aviation Facts

 Aviation Definitions

 Runway Markings

 Related Links

Learn More ...


Your Opinions Count!

Visit our
Web Discussion Forum



Today is

A Safer Airport: Airport Improvement Summary

  Airport Improvement Summary

Solberg Airport - N51
Airport Improvement Summary
for the Proposed Airport Layout

The airport improvements proposed for Solberg Airport will:

  1. Enhance the safety of operations;
  2. Provide the facilities and services that meet the aviation demand in a fiscally responsible manner; and
  3. Increase compatibility between the airport, its environment, and the surrounding communities.
  Airside Improvements

Main Runway:

  • Move the main runway 4-22 350 feet west away from homes. Change the runway's dimensions from 3,735 feet x 183 feet (turf with superimposed 3,000 foot x 50 foot asphalt) to 4,300 feet x 100 feet (asphalt).
  • Convert the existing runway to a 50-foot wide full-length parallel taxiway.
  • Install a Precision Approach Slope Indicator (PAPI) to provide inbound pilots with visual information about their position on the approach glide slope.

Crosswind Runway:

  • Pave the crosswind runway 13-31. Change the crosswind runway's dimensions from 3,440 feet x 200 feet (turf) to 3,700 feet x 75 feet (asphalt).
  • Provide a 35-foot wide full-length parallel taxiway.

Top of page 

  Landside Improvements

Terminal apron:

  • Remove and renovate the existing terminal apron and tie-down ramp to provide sufficient space for visiting aircraft.
  • Provide taxilane access to the rear door of the North Hangar.

Fuel Storage:

  • Relocate and modernize the fuel farm.

Aircraft Storage:

  • Construct a Southside tie-down ramp (32 units) and T-hanger storage area (48 units) for aircraft storage.

Perimeter Fencing:

  • 6-foot high chain-link fence around the perimeter of the airport.

Weather Reporting:

  • Install an Automated Weather Observation System (AWOS) to provide accurate local weather information to pilots in-flight and while on the ground prior to departure.

Top of page 

  Market Served

Small aircraft with less than 10 passenger seats. Aircraft based at Solberg, by type, include: single engine (88%); multi-engine (9%); turbo-prop (2%); turbo-jet (1%). Daily operations by aircraft type: single engine (91%); multi-engine (5%); turbo-prop (3%); turbo-jet (1%). (Note: percentages based on 1995 actual data contained in the Master Plan).

Top of page 

  Safety Issues

Increase Runway Takeoff and Landing Safety Margins:

  • Appropriate runway length
  • Install standard runway lighting (PCL - pilot controlled lighting), runway edge lighting, signage and runway markings

Prevent Runway Incursions:

  • Provide access to each runway end
  • Minimize aircraft runway occupancy time
  • Eliminate backtaxi maneuvers (in order to use the full length of the runway, aircraft have to taxi back on the runway to its starting point)

Improve Aircraft Taxiing & Maneuvering:

  • Aircraft taxiing to a runway end can bypass the apron area
  • Install standard taxiway lighting, taxiway edge lighting, signage and taxiway markings
  • Provide sufficiently wide taxiways to avoid interference with parked aircraft

Provide Up-to-the-Minute Information to the Pilot:

  • Install an Automated Weather Observation System (AWOS) to provide accurate local weather information including cloud ceiling, visibility, atmospheric pressure, wind direction and velocity, temperature and dew point to pilots in-flight and while on the ground prior to departure.

Enhance Security:

  • Install perimeter fencing to deter deer entry and to prevent people from entering the airfield's airside environment.

Top of page 

  Project Costs

The project cost estimates are $15,665,000 as of September 1997. The funds will come from FAA and state grants, and sponsor funding. The FAA capital will come from the Airport Improvement Program funded by aviation taxes. None of the funds come from local or state income or property taxes.


Prepared by PARTNERS@Solberg.

Top of page 

 STOP the CONDEMNATION of PRIVATE PROPERTY!

If you are interested in joining PARTNERS @ Solberg or are interested in helping us educate and inform area residents about the benefits of general aviation, please contact us for information about joining our group that is dedicated to finding effective reasonable solutions!